05Projects & field work
Proof, not renders.
Recent SH prepaid installations: new laterals, retrofits, estate drops and building connections. Start with the site video, then walk the photo entries.
10 photo entries • 1 site film (4:24)
Film 01: A prepaid lateral goes live (4:24)
Field notes: every install
STEP 1
Trench and bedding
Clean bed, no stones on the barrel.
STEP 2
Valve and union train
Isolation without cutting the line.
STEP 3
Meter set and align
Level, flow arrow downstream.
STEP 4
Test, then backfill
Pressure and flow check first.
Entries 01–10: select any frame for the viewer
Reference photos show workmanship only. For BOQs, datasheets and calibration certificates, see Certifications or Contact.