Proof, not renders.

Recent SH prepaid installations: new laterals, retrofits, estate drops and building connections. Start with the site video, then walk the photo entries.

10 photo entries • 1 site film (4:24)

Film 01: A prepaid lateral goes live (4:24)

Field notes: every install

  1. STEP 1

    Trench and bedding

    Clean bed, no stones on the barrel.

  2. STEP 2

    Valve and union train

    Isolation without cutting the line.

  3. STEP 3

    Meter set and align

    Level, flow arrow downstream.

  4. STEP 4

    Test, then backfill

    Pressure and flow check first.